MT 3024 Measure T Street Rehabilitation on Heritage Way
General Description of Work: The work generally consists of mobilization and demobilization; developing, implementing and maintaining a traffic control system and water pollution control program; cold planing, removing and disposing of existing pavement; placement of hot mix asphalt: lowering and adjusting utility covers; cleanup of the project areas, and other items of work as shown in the contract documents.
Specifications
(click to expand/collapse)

Name | Size | ||
230086-01_TS_100%Signed | 952.8 KB |