MT 3025 Solano Avenue Pavement Rehabilitation Project

General Description of Work: The work generally consists of mobilization, developing, implementing and maintaining a traffic control system and water pollution control program, cold planing, removing and disposing of existing pavement, placement of hot mix asphalt and rubberized hot mix asphalt materials, lowering and adjusting utility covers, installing traffic striping and pavement markings, cleanup of the project areas, and other items of work as shown in the contract documents.
Plans (click to expand/collapse)
Name Size
240113-01_SolanoAve 786.9 KB