2022 Sanitary Sewer Sliplining Project

The work generally consists of mobilization, traffic control, stormwater and SSO control plan, clean and video all lines before Sliplining PVC fold and form 6”, 8” and 10” lines, restore laterals, post work video inspection, construct a new SS manhole, install “Top Hats” at each reinstated lateral connections. All work is performed manhole-to-manhole (or cleanout). Contractor shall provide bypass pumping for uninterrupted service. Fiberglass and CIPP are not considered approved equals to the PVC “fold and form” type liner.
Date Company Contact
1652267512
5/11/22 11:11 am
ConstructConnect 3825 Edwards Rd.
Suite 800
Cincinnati, OH 45209
Michael Stubbs
Sr. Editorial Content Lead
Tel: 800-364-2059
1650496452
4/20/22 4:14 pm
Construction Bidboard, Inc. 11622 El Camino Real # 100
San Diego, CA
000 Plan Room
Tel: 800-479-5314
1650584170
4/21/22 11:36 pm
Dodge Data & Analytics 2860 S State Hwy 161
Ste 160 #501
Grand Prairie, TX 75052
Jayalakshmi L
Other
Tel: 413-376-7032
Fax: 609-336-2767
1651071648
4/27/22 3:00 pm
Kerex Engineering Inc. 93 Monte Cresta Ave.
Pleasant Hill, CA 96523
Hector Barajas
Project Engineer
Tel: 9253878913
Fax: 9253870853
1650496430
4/20/22 4:13 pm
Marin Builders Exchange 660 Las Gallinas Avenue
San Rafael, CA 94903
000 Plan Room
Tel: 415-462-1220
1650530438
4/21/22 8:40 am
Miksis Services Inc 55 Healdsburg Ave
Healdsburg, CA 95448
Gary Miksis
Tel: 7074338053
1650496423
4/20/22 4:13 pm
North Coast Builders Exchange 1030 Apollo Way
Santa Rosa, CA 95407
000 Plan Room
Tel: 707-542-9502
1651594059
5/3/22 4:07 pm
Sancon 5841 Engineer Dr.
Huntington Beach, CA 92649
John Hernandez
Tel: 714-891-2323
1650496416
4/20/22 4:13 pm
Solano-Napa Builders Exchange 135 Camino Dorado
Napa, CA 94558
000 Plan Room
Tel: 707-255-2515
1650496402
4/20/22 4:13 pm
Valley Contractors Exchange 951 8th ST.
Chico, CA 95928
Elizabeth Carter
Tel: 530-343-1994