2022 Sanitary Sewer Sliplining Project
The work generally consists of mobilization, traffic control, stormwater and SSO control plan, clean and video all lines before Sliplining PVC fold and form 6”, 8” and 10” lines, restore laterals, post work video inspection, construct a new SS manhole, install “Top Hats” at each reinstated lateral connections. All work is performed manhole-to-manhole (or cleanout). Contractor shall provide bypass pumping for uninterrupted service. Fiberglass and CIPP are not considered approved equals to the PVC “fold and form” type liner.
Specifications
(click to expand/collapse)
Name | Size | ||
Notice to Bidders | 246.0 KB | ||
WW2022-2022 SANITARY SEWER SLIPLINE | 2.1 MB |