MT 3023 Measure T Street Rehabilitation at Various Locations
The work generally consists of mobiliztion and demobilization; developing, implementing and maintaining a traffic control system and water pollution control program; cold planing, removing and disposing of existing pavement; placement of hot mix asphalt (HMA); lowering and adjusting utility covers; replacement of traffic striping and pavement markings; installing shoulder backing; cleanup of the project areas, and other items of work shown in the contract documents.
Status
Bidding Closed
Bid Date | 6/22/22 2:00pm |
Company & Contacts
City of Yountville
Rosalba Ramirez
707-944-8851
Location
Yountville,CA
Engineer’s Estimate for Base Bid is $285,000.00