MT 3023 Measure T Street Rehabilitation at Various Locations
The work generally consists of mobiliztion and demobilization; developing, implementing and maintaining a traffic control system and water pollution control program; cold planing, removing and disposing of existing pavement; placement of hot mix asphalt (HMA); lowering and adjusting utility covers; replacement of traffic striping and pavement markings; installing shoulder backing; cleanup of the project areas, and other items of work shown in the contract documents.
Specifications
(click to expand/collapse)
Name | Size | ||
Specs for Advertising_Signed | 1.6 MB |